Zinc Nacional
Hydraulic study of the conduction line from the San Rafael Treated Wastewater and Rebombeo Alamey plant, and the following was carried out:
- Inspection of the existing infrastructure
- Recognition of equipment in operation
- Flow measurement with ultrasonic equipment to all wastewater customers supplied by said infrastructure
- Analysis of the conduction line
- Analysis of transient phenomena
- Proposal for relief valves
- Improvement proposals and areas of opportunity
- Update of information